Province-Wide Tracking

Data Centre Projects Across Alberta

Community-submitted and independently tracked projects province-wide. Every entry represents a community that deserves answers.

22Total Projects
17Proposed
0Under Review
1Approved

Showing 22 of 22 projects

Armada Nowlit Data Centre Southeast of Clive

Lacombe County, AB (southeast of Clive)

Proposed
Central AlbertaMixed AI / Cryptocurrency19.8 MW proposed on-site generationSubmitted 2026

A proposed mixed AI and cryptocurrency data centre southeast of Clive in Lacombe County, developed by Armada Nowlit Energy. The project proposes 19.8 MW of on-site natural-gas generation with biofuel capability and closed-loop dry cooling. It has drawn significant community concern and was the subject of a public hearing in October 2026.

Community Concerns

No public consultation processLimited community awareness of the project
Contact available

Sturgeon Data Centre (Meta)

Sturgeon County, AB (Alberta Industrial Heartland)

Approved
Edmonton RegionHyperscale / AI1 GW announced capacitySubmitted 2024

Meta Platforms Inc. has received approval to construct a large-scale hyperscale data centre in Sturgeon County's Alberta Industrial Heartland. ADCW records a 250 MW Capital Power supply agreement plus an approved 932 MW dedicated natural-gas plant planned for later service. The facility is one of the largest approved data centre investments in Alberta's history, raising significant concerns about power grid strain, water consumption, and the precedent set for future hyperscale development.

Community Concerns

Massive power draw from Alberta's gridWater consumption in a water-stressed regionPrecedent for further hyperscale approvalsLimited local economic benefit relative to resource use

Sundance Data Centre

Parkland County, AB

Proposed
Edmonton RegionHyperscale401 MWSubmitted 2026

A proposed data centre in Parkland County near the Sundance area, with a reported capacity of 401 MW sourced from the AESO connection project dashboard. This project does not yet appear in the ADCW verified database and was submitted by a nearby resident. Parkland County is also home to the Boreal Technology Hub — together these projects represent a significant concentration of proposed data centre load in a single rural county.

Community Concerns

Environmental impacts — land, water, and air qualityHealth and safety risks — fire risk from heat domesProperty values for nearby residents
Contact available

Genesee Data Centre Site

Leduc County, AB (50444 Highway 770)

Proposed
Edmonton RegionHyperscale1.5 GW across two AESO connection requestsSubmitted 2026

Two proposed data centre units near the Genesee generating station in Leduc County, with a combined 1.5 GW across two AESO connection requests. The existing 1,857 MW Genesee natural-gas generation site would supply power. The developer has not been publicly identified.

Community Concerns

Environmental impacts — land, water, and air qualityHeat domes and localized climate effectsHuman and animal health in close proximityProperty values for nearby residents1.5 GW combined load across two AESO connection requests
Contact available

Boreal Technology Hub

Parkland County, AB

Proposed
Edmonton RegionData centre / Workload undisclosed230 MW initial grid-load contractSubmitted 2026

A proposed data centre at the Keephills generating station site in Parkland County. TransAlta would provide the site and electricity under a 230 MW initial grid-load contract. The final mix of grid power, existing generation, and any new equipment has not been confirmed.

Community Concerns

Environmental impacts — land, water, and air qualityHeat domes and localized climate effectsHuman and animal health in close proximityProperty values for nearby residents230 MW initial grid-load contract with TransAlta
Contact available

Synapse Olds Data Centre

Olds, AB

Inactive
Central AlbertaHyperscale / AI1 GW proposed (inactive — no approved power source)Submitted 2026

A proposed 1 GW hyperscale data centre in Olds, AB that has been listed as inactive by the Alberta Utilities Commission. The AUC found no approved power source for the project. The ruling marks a significant decision for communities across Alberta pushing back against large-scale data centre development on agricultural land.

Community Concerns

Agricultural land conversionWater usagePower grid impactLack of public consultation
Contact available
Data District Olds Facility

Data District Olds Facility

Olds, AB

Proposed
Central AlbertaAI / High-performance computing55 MW announcedSubmitted 2026

Data District Inc. has announced a 55 MW AI and high-performance computing facility in Olds, AB, with planned grid supply through FortisAlberta distribution. The Town of Olds is monitoring the proposal and has committed to open communication with residents as the process develops.

Community Concerns

Agricultural land conversionPower grid impactWater usageCommunity consultation
Contact available

Grande Prairie Northern Data Centre

Grande Prairie, AB

Proposed
Northern AlbertaHyperscaleNot publicly disclosedSubmitted May 2026

A hyperscale facility proposed for land north of Grande Prairie. This project was submitted by a community member and does not yet appear in the ADCW verified database. Local agricultural groups have submitted formal objections regarding water allocation.

Community Concerns

Water allocationAgricultural impactNorthern grid reliability
Contact available

Beacon Foothills AI Data Center Hub

Foothills County, AB (east of High River)

Proposed
Calgary RegionAI / High-performance computing400 MW proposed data centre campusSubmitted 2026

A Beacon AI Centers proposal in Foothills County east of High River. The 400 MW campus proposes on-site generation. Part of Beacon's announced six-site Alberta portfolio totalling approximately 4.5 GW — about 44% of Alberta's 2025 average electricity demand.

Community Concerns

Agricultural land conversionRural infrastructure strainPower grid impactCumulative impact of multiple sites
No contact yet

Beacon Indus AI Data Center Hub

Rocky View County, AB (northwest of Indus)

Proposed
Calgary RegionAI / High-performance computing1.2 GW proposed data centre loadSubmitted 2026

A Beacon AI Centers proposal northwest of Indus in Rocky View County with 1.2 GW proposed data centre load and 1.494 GW proposed on-site natural-gas generation. One of the largest single-site proposals in Alberta. Part of Beacon's announced six-site Alberta portfolio.

Community Concerns

Agricultural land useWater accessCommunity notificationCumulative impact of multiple sites
No contact yet

Beacon Chestermere AI Data Center Hub

City of Chestermere, AB

Proposed
Calgary RegionAI / High-performance computingApproximately 400 MW proposed at full buildSubmitted 2026

A Beacon AI Centers proposal in southern Chestermere with approximately 400 MW proposed at full build. Grid supply through a transmission extension and dedicated substation is proposed. Part of Beacon's announced six-site Alberta portfolio.

Community Concerns

Rural land conversionPower grid impactLack of public consultation
No contact yet

Beacon Harry Smith AI Data Center Hub

Parkland County, AB

Proposed
Edmonton RegionAI / High-performance computing400 MW AESO connection requestSubmitted 2026

A Beacon AI Centers proposal in Parkland County with a 400 MW AESO grid connection request. Part of Beacon's announced six-site Alberta portfolio totalling approximately 4.5 GW.

Community Concerns

Rural infrastructureAgricultural land useGrid connection costs
No contact yet

Beacon Heartland AI Data Center Hub

Sturgeon County, AB (approximately 7 km east of Gibbons)

Proposed
Edmonton RegionAI / High-performance computing800 MW proposed data centre loadSubmitted 2026

A Beacon AI Centers proposal approximately 7 km east of Gibbons in Sturgeon County with 800 MW proposed data centre load and 920 MW proposed on-site natural-gas generation. Part of Beacon's announced six-site Alberta portfolio.

Community Concerns

Cumulative industrial impactWater usagePower grid strain
No contact yet

Beacon Saunders Lake AI Data Center Hub

Leduc County, AB

Proposed
Edmonton RegionAI / High-performance computing400 MW AESO connection requestSubmitted 2026

A Beacon AI Centers proposal in Leduc County with a 400 MW AESO grid connection request. Community members have raised concerns about proximity to Saunders Lake and potential water impacts. Part of Beacon's announced six-site Alberta portfolio.

Community Concerns

Proximity to Saunders LakeWater impactAgricultural land use
No contact yet

Crusoe Crossfield / Lone Pine Energy Park Data Centre

Rocky View County, AB

Inactive
Calgary RegionAI / High-performance computing170 MW original power-plant concept (withdrawn)Submitted 2026

A Crusoe Energy Systems proposal in Rocky View County near Crossfield that has been withdrawn. The original concept paired the data centre with a planned natural-gas plant (170 MW original framework; 200 MW in a later portfolio). AESO lists the related 178 MW gas-generation request as cancelled.

Community Concerns

Emissions from gas-powered operationsAgricultural land useLong-term energy commitments
No contact yet

Crusoe Alsike Energy Park Data Centre

Brazeau County, AB (near Warburg)

Proposed
Central AlbertaAI / High-performance computing170 MW related power plantSubmitted 2026

A Crusoe Energy Systems proposal near Warburg in Brazeau County. A planned 170 MW co-located natural-gas plant would supply power, with Crusoe expected to buy power under a minimum 15-year power purchase agreement.

Community Concerns

Agricultural land conversionEmissionsRural infrastructure
No contact yet

Crusoe Myers Energy Park Data Centre

Red Deer County, AB (near Lacombe)

Proposed
Central AlbertaAI / High-performance computing170 MW related power plantSubmitted 2026

A Crusoe Energy Systems proposal near Lacombe in Red Deer County. A planned 170 MW co-located natural-gas plant would supply power, with Crusoe expected to buy power under a minimum 15-year power purchase agreement.

Community Concerns

Power grid strainWater usageCumulative regional impact
No contact yet

Goldfinch Technology Park Data Centre

Wheatland County, AB (approximately 3.3 km west of Carseland)

Proposed
Calgary RegionData centre / Workload undisclosed950 MW AESO connection requestSubmitted 2026

A large-scale data centre proposed approximately 3.3 km west of Carseland in Wheatland County, listed by ADCW as Goldfinch Technology Park. Air-based cooling is proposed with final equipment pending. Grid supply through AESO P3102 is proposed with on-site emergency backup. The project has also been tracked under the Northgate NXS name. The scale of this campus raises significant concerns about cumulative grid and land use impacts.

Community Concerns

950 MW AESO connection requestAgricultural land conversionPower grid capacityWater usage
No contact yet

Mihta Askiy Data Centre

Northern Sunrise County, AB (approximately 40 km northeast of Peace River)

Proposed
Northern AlbertaAI / High-performance computing650 MW proposed data centre load at full buildSubmitted 2026

A proposed 650 MW data centre at the former Carmon Creek site approximately 40 km northeast of Peace River in Northern Sunrise County. Proposes 650 MW on-site natural-gas generation with a planned grid connection and closed-loop cooling.

Community Concerns

Remote grid connectivityTransmission infrastructure costsNorthern land use
No contact yet

Hut 8 Medicine Hat

Medicine Hat, AB (5254 Box Springs Road NW)

Operating
Southern AlbertaCryptocurrency / ASIC compute67 MW listed site capacitySubmitted 2026

An operating Hut 8 Corp cryptocurrency (ASIC compute) facility in Medicine Hat with 67 MW listed site capacity. The facility was developed with municipal electricity supply and has been in service since 2018. Hut 8 is a publicly traded digital infrastructure company with multiple Alberta sites.

Community Concerns

Power consumptionGrid resource allocationPublic accountability of listed company
No contact yet

Hut 8 Drumheller

Drumheller, AB

Operating
Central AlbertaCryptocurrency / ASIC compute42 MW listed site capacitySubmitted 2026

An operating Hut 8 Corp cryptocurrency (ASIC compute) facility in Drumheller with 42 MW listed site capacity. Hut 8 is a publicly traded digital infrastructure company with multiple Alberta sites.

Community Concerns

Grid capacity in small communityEnergy demandLand use compatibility
No contact yet

Wave Infrastructure AI Research Lab

Red Deer County, AB (Junction 42 Business Park)

Proposed
Central AlbertaAI Computing~5 MW critical compute / ~7–8 MW facility powerSubmitted 2026

A proposed Canadian-owned AI research lab at Junction 42 Business Park in Red Deer County, 500 metres from the QEII Highway. Developer Wave Infrastructure Ltd. (parent company Wafr Technologies Ltd.) is targeting ~5 MW of critical AI compute with a claimed 1.05–1.15 PUE and up to 90% reduction in water demand compared with conventional evaporative cooling. Red Deer County is required to rezone Lot 24 under the Municipal Government Act; a public hearing process is underway. Commercial operation is targeted for Q1 2028.

Community Concerns

Rezoning of agricultural/industrial land requiredPublic hearing process underwayGrid and energy supply details not yet public

Province-Wide View

Projects span the entire province — from the Peace Country to the foothills.

Proposals are appearing in rural municipalities, agricultural zones, and small towns across Alberta — often with little public notice.

Proposed
Under Review
Approved
Denied
Community Submitted
Northern AlbertaCentral AlbertaCalgary RegionSouthern AlbertaEdmonton RegionEdmontonCalgaryRed DeerLethbridgeGrande PrairieMedicine Hat
13 Proposed
1 Under Review
4 Approved
1 Denied

Hover over any pin to see project details. Pin locations are approximate. Submit a project to add it to the map.

Know of a project we've missed?

Help us build a complete picture of data centre development across Alberta. Submissions are open to everyone. No account required.

Related Resources & Websites

Other organisations, initiatives, and resources tracking data centre development and energy policy across Alberta.

Expert Evidence

Dr. Stelfox — AUC Cumulative Effects Testimony (Exhibit 359)

Wildlife biologist Dr. Brad Stelfox testified to the AUC that Beacon AI's cumulative effects assessment is profoundly incomplete — ignoring water, noise, air, and land use impacts across the region. Recommends a provincial strategic assessment under the Alberta Land Use Framework.

Aug 16, 2026 · AUC Exhibit 359
Watchdog

Alberta Data Centre Watch

An independent watchdog site monitoring data centre development across Alberta, tracking proposals, approvals, and community impacts province-wide.

Directory

DataCenters.com — Alberta

A global data centre directory with a dedicated Alberta listings page. Browse facilities by location, size, and operator across the province.

Sister Project

Olds Transparency Project

The original community initiative tracking data centre proposals in Olds, AB. The foundation for this province-wide project.

Regulator

Alberta Utilities Commission

The AUC regulates Alberta's electric and gas utilities. Search active proceedings, decisions, and applications including data centre power approvals.

Government

Alberta Land Use Framework

Provincial land use planning policy governing industrial development on agricultural and rural land across Alberta's seven regions.

Grid Operator

Alberta Electric System Operator

AESO manages Alberta's power grid. Tracks load growth, connection requests, and the grid impact of large industrial consumers like data centres.

Government

Alberta Municipal Affairs

Oversees municipal planning and development approval processes in Alberta. A key resource for understanding how development permits are issued.

Research

Pembina Institute

Canadian clean energy think tank publishing research on grid impacts, energy policy, and industrial electricity demand including data centre growth in Alberta.

Alberta Transparency Project

A province-wide hub for data center transparency, community networking, and civic accountability across Alberta.